Just a quick update on the build so far; the door’s on, the lock’s on, the roof’s on, the floor’s on, the faces have been sanded and the reservoir is in place. It’s now just down to some finishing touches including chamfering the roof, cutting slate for the pool of water and oiling the finished box. Then all we need to do is insert the electronics, I can almost feel the rain now.

 

 

Also the irrigation system has been fully prototyped and with some select placement of holes we have our rain drops ready to be placed inside.

 


Read more from James Rice at http://www.jamesricedesign.wordpress.com